Energy efficiency can be a useful part of a lift investment case, but a savings percentage is meaningful only when the baseline and assumptions are clear. Building owners should compare measured or properly assessed consumption with the specific proposed change.
Establish what is being measured
Ask a qualified professional to define a suitable measurement arrangement. Identify whether the data covers one lift, several lifts or unrelated building loads. Record the period, occupancy pattern and any downtime. A single whole-building electricity bill cannot isolate a lift’s consumption.
Keep energy and demand charges distinct where the tariff requires it. Use the actual tariff assumptions and document them in the calculation. Staff should not access electrical panels or improvise a temporary meter.
Ask suppliers to explain the calculation
- What equipment is included in the baseline?
- What changes in the proposed system?
- Which usage and standby assumptions are used?
- Are estimates based on measurements, a model or a general comparison?
- Which costs and savings are excluded?
Lower installed motor power does not, by itself, calculate annual electricity savings. Journey patterns, equipment operation and standby consumption also need consideration. If a proposal includes a regenerative drive, request equipment-specific compatibility and benefit information rather than assuming a universal outcome.
Use a transparent payback calculation
Compare the full project cost with the estimated annual net savings under stated assumptions. Include required enabling work and any changed maintenance costs. Show a reasonable range if usage or tariff assumptions are uncertain. Keep reliability and passenger-experience objectives visible even when they cannot be reduced to a simple electricity figure.
A favourable energy projection does not remove the need for condition assessment, compatibility checks or the applicable project approvals. Treat it as one element of a broader options review.
Plan how the outcome will be checked
Agree a post-work measurement period and a comparable baseline. Note changes in occupancy, operating hours and tariff so differences are not automatically attributed to the lift modification. Retain the original calculation and the actual results for future budgeting.