Handover should leave a building able to operate, maintain and manage its new lift with clear responsibilities. A demonstration and an invoice are only part of that process.
Agree a handover register before completion
Ask the installation team to identify the records that apply to the project and the applicable local approval process. Requirements differ by installation and jurisdiction. This owner’s register supports coordination; it does not replace a professional determination of required certificates or approvals.
Give each deliverable an owner, due date and storage location. Use a shared building record with controlled access for technical documentation, rather than leaving the only copy on an individual staff member’s phone.
| Group | Items to request where applicable |
|---|---|
| Equipment | Lift identification, installed specifications, drawings and component records. |
| Operation | Equipment-specific user instructions, authorised contacts and staff orientation. |
| Completion | Inspection and testing records, approvals and agreed outstanding-item list. |
| Commercial | Accepted scope, variations, invoices and warranty terms. |
| Maintenance | Start date, responsible provider, visit scope and fault-reporting process. |
Make the demonstration practical
Building staff should know the normal passenger controls, how to report a fault and how to identify the lift when asking for help. Restricted equipment, rescue work and technical adjustment remain with the authorised professionals.
Record who attended the orientation and how future staff will receive the same information. Do not share restricted keys, credentials or technical controls indiscriminately as part of a general occupant information pack.
Close outstanding items deliberately
Use a numbered list describing each issue, its responsible party and its status. Separate cosmetic snagging from matters that affect readiness for service. Management should obtain the responsible professionals’ decision about use rather than inferring readiness from a working cabin demonstration.
Keep evidence of closure against each item. A statement that all work is complete is harder to review than an agreed list with specific outcomes.
Start maintenance without a gap
Confirm the first service arrangements, warranty reporting route and the contact responsible for attendance. Warranty and maintenance are different obligations; check how they interact. For a Karachi installation, ask Shinkai to include the proposed handover deliverables and maintenance transition in the project scope.